§ 505.075. Requirements Relating To Construction Sites.


Latest version.
  • A. 
    The following requirements relating to all construction sites in the City shall be enforced by the Building Commissioner or designee:
    1. 
    All construction sites in the City shall be kept in an orderly and clean condition at all times in accordance with the specific requirements of this Section.
    2. 
    Building materials to be used or incorporated in the work shall be stored in an orderly fashion and shall not be located on any rights-of-way of the City. Such building materials shall be used or incorporated into the work within fifteen (15) days after they are delivered to the construction site.
    3. 
    All construction waste, debris and surplus construction materials shall be collected on a daily basis and shall be placed in a portable dumpster or removed from the construction site within forty-eight (48) hours after collection. Portable dumpsters shall not be placed on any public right-of-way.
    4. 
    Any excavation in any right-of-way related to a construction site shall be backfilled within fifteen (15) days. The Building Commissioner may grant an extension of time for reasons determined to be valid by the Building Commissioner upon written application of the contractor or subcontractor which is obligated to do the backfilling.
    5. 
    All portable toilets utilized at a construction site shall be placed at a location which is a minimum of twenty-five (25) feet behind the front property line and a minimum of at least five (5) feet away from any applicable side or rear setback lines or other location approved by the Building Commissioner. In no event shall a portable toilet be located on a public right-of-way.
Ord. No. 1572 § 3, 8-23-2016